86exporter.com Home       Products Catalog      Suppliers Catalog      Log In        Sign up
      About Us
      Profile
      Products
      Contact Us


Shenzhen LCS Compliance Testing Laboratory Ltd.

Products >> What items are tested in LED fluorescent lamp LM79/LM80/LM82/TM2

What items are tested in LED fluorescent lamp LM79/LM80/LM82/TM2

Build Your Online Product Catalogs?



Description
Product Name: What items are tested in LED fluorescent lamp LM79/LM80/LM82/TM2
Supply Ability:
Related proudcts lm80, lm79, tm21,
Specifications You can contact my email zhenhong.zhu@lcs-cert.com
Price Term:
Port of loading:
Minimum Order
Unit Price:

LM82 is the follow-up standard of LM79, which stipulates the electrical and optical tests of LED light engine (SSL, I think) and integral LED lamp at different temperatures after the temperature is raised. It mainly includes the following * * *: a. The sample to be tested needs to provide the temperature monitoring point Tb and the temperature monitoring point Td of the power supply (not mandatory). b. Initial test - test the power, luminous flux and color parameters according to Section IX of LM79 at an ambient temperature of 25 ¡À 1 ℃, and monitor the Tb value at this time, which is recorded as Tbi. c. Calibration test: adjust the ambient temperature to make Tb reach the ambient temperature (25 ¡À 1 ℃) at the time of initial test, then test the power, luminous flux and color parameters, and monitor and record the Tb value at this time, which is recorded as Tb0. d. * * * Secondary temperature rise test: adjust the ambient temperature to make Tb reach Tb0+25 ℃, then test the power, luminous flux and color parameters, monitor and record the Tb value at this time, and record it as Tb1. E. Second temperature rise test: adjust the ambient temperature to make Tb reach Tb0+50 ℃, then test the power, luminous flux and color parameters, monitor and record the Tb value at this time, and record it as Tb2. f. The above measured data shall be processed according to the standard to obtain the photometric characteristics after temperature rise. g. As mentioned in the standard, it is recommended to use a temperature controlled integrating sphere for temperature control. Other methods must be able to control the temperature at Tb point without affecting the photometric test.

Contact Us
Company: Shenzhen LCS Compliance Testing Laboratory Ltd.
Contact: Mr. Zhen Hong Zhu
Address: F1, Building A, Juji Industrial Park, Yabian Xueziwei, Yabian Community, Shajing Street, Bao'an District, Shenzhen
Postcode: 518000
Tel: +8618923745517
Fax:
E-mail:         


Copyright© Shenzhen LCS Compliance Testing Laboratory Ltd. All Rights Reserved.
Tel : +8618923745517 Fax :
Powered by 86exporter.com